PROJECT <<322 SLT 1921 REDUCCION DE PERDIDAS DE ENERGIA EN DISTRIBUCION (4A FASE)>>. CONTRACT PIF-007/2015

Execution of all the works necessary for the construction and installation of 10 (ten) works: 6 (six) works of loss reduction with voltage of 23 kV, a total capacity of 102.42 MVA of transformation and the construction of 427.54 km-c of line; and 4 (four) works of measurement assurance. Said works imply the removal, supply and installation of 250,522 energy meters AMI type with any type of communication; located in the state of Mexico City and State of Mexico. Includes activities of engineering, supply, construction and tests.