Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 (three) transmission lines with voltages of 400 kV and a total length of 397.1 km-c and 3 (three) substations with voltages of 400 and 230 kV, with a total capacity of 375 MVA, 233.3 MVAr of the inductive type and 12 (twelve) feeders, located in the states of Hidalgo, Queretaro and San Luis Potosi. Includes the following works:
- LT Las Mesas – Queretaro Potencia Maniobras: 400 kV, 2c, 196.8 km-l, 393.6 km-c; self-supported towers; conductor cable: ACSR/As 1113, 3 cond/phase; guard wire: 1 Alumoweld 7 No. 8 AWG +1 Opgw 36 fiber.
- LT Queretaro Pot. Maniobras Entq. Qro. Pot. – Tula Pv (L1 Y L2): 400 kV, 2c, 1.75 km-l, 3.5 km-c; self-supported towers; conductor cable: ACSR/As 1113, 3 cond/phase; guard wire: 1 Alumoweld 7 No. 8 AWG + 1 Opgw 36 fibers.
- SE Las Mesas + MVAr: 2 at 400 kV Intercon. Pee Tamazunchale; 2 at 400 kV LT Champayan (C1 + C2); 2 at 400 kV LT Queretaro Potencia Maniobras (C1 + C2); 7 X 33,33 MVAr LT Queretaro Pot. Man. (C1+ C2). Includes reserve reactor.
- SE Queretaro Potencia Maniobras: 2 at 400 kV LT Las Mesas (C1 + C2); 2 at 400 kV Apert. Qro. Pot.-Tula Pv (L1); 2 at 400 kV Aper. Qro. Pot.-Tula Pv (L2).
- SE Queretaro Potencia Banco 4: 3 At-1f-125 MVA-400/230 kV-0/0 A