PROJECT 218 LT TRANSMISSION GRID ASSOCIATED TO THE PROJECT OF OPEN SEASON AND OAXACA II, III, IV (1A. FASE)

Engineering, procurement of materials and equipments of permanent installation, training, construction and commissioning of 2 transmission lines with voltage of 400 kV and a length of 424.2 km-c (LT Juile – Cerro de Oro 400 kV-154.28 km-c and LT La Ventosa – Juile 400 kV 270-6 km-c), and 3 substations with voltages of 400, 230 and 115 kV with a capacity of 2,125 MVA, 75 MVAr and 8 feeders (SE Cerro de Oro 400 kV, SE Juile + MVAr 400 kV and SE La Ventosa Bcos. 1, 2 and 3 400/230/115 kV). The titular of the Contract with CFE was constituted by ISOLUX, ELECTRICAS / EDEMTEC, PIDIRELYS (Electricas de Medellin/Edemtec has a participation of 21.02% on the project).