PROJECT 211 SLT 1203 TRANSMISION Y TRANSFORMACION ORIENTAL-SURESTE (1A FASE). CONTRACT No. PIF-017/2009

Engineering, supply, construction, training and commissioning of 9 LT’s of 400, 230 and 115 kV and a total length of 196.1 km-c and 6 SE’s with voltages of 400, 230 and 115 kV, with a capacity of 1175 MVA nad 22.5 MVAr and 25 feeders, in the states of Chiapas and Veracruz.

  • LT Jardin – Veracruz II. 115 kV, 2 circuits, self-supported towers, 1.1 km-l, 2.2 km-c, one conductor ACSR/As 795 per phase.
  • LT Jardin – Infonavit 115 kV, 2 circuits, subterranean cables, 0.2 km-l, 1.3 km-c; conductor cable of the XLPE type copper and a transversal section of 1.000 squared millimeters per phase.
  • LT Laguna Verde – Jamapa. 400 kV, 2 circuits, self-supported towers, 84.7 km-l, 168.4 km-c, two conductors ACSR/As 1113 per phase.
  • LT Jamapa Entq. Veracruz II – Temascal II L1. 230 kV, 2 circuits, self-supported towers, 2.5 km-l, 5 km-c, ACSR/As 1113, one conductor per phase.
  • LT Jamapa Entq. Jardin – Temascal II L2. 230 kV, 2 circuits, self-supported towers, 2.5 km-l, 500 km-c, ACSR/As 1113, one conductor per phase.
  • LT Jardin – Las Brisas. 115 kV, 2 circuits, self-supported towers/subterranean cable, 3.1 km-l, 4.8 km-c. Conductor cable XLPE type, copper and a transversal section of 1.000 squared millimeters per phase.
  • LT Jardin – J.B. Lobos. 115 kV, 2 circuits, self-supported towers/subterranean cables, 3.1 km-l, 4.8 km-c. Conductor cable XLPE type, copper and transversal section of 1.000 squared millimeters per phase and ACSR/As 795.
  • LT Paso del Toro Entq. Boca del Rio – La Granja III. 115 kV, 4 circuits, self-supported towers, 0.3 km-l, 1.2 km-c, conductor cable ACSR/As 795.
  • LT Jamapa Entq. Veracruz II – Amatlan II. 230 kV, 4 circuits, self-supported towers, 1.4 km-l, 5.6 km-c; conductor cable ACSR/As 1113, one conductor per phase.
  • SE Jamapa Bcos. 1 y 2 7at-1f-125 MVA, 400/230 kV 2/8; 2 at 400 kV LT Laguna Verde (C1 + C2); 1 at 230 kV LT Jardin; 1 at 230 kV LT Veracruz II; 2 at 230 kV LT Temascal II; 2 at 230 kV LT Amatlan II; 2 at 230 kV LT Tamsa II.
  • SE Paso del Toro 1 at 115 kV LT Granja III; 1 at 115 kV LT Boca del Rio.
  • SE Laguna Verde (Sf6) Maniobras 2 at 400 kV LT Jamapa (C1+C2); 2 at 400 kV LT Laguna Verde (U1+U2); 1 at 400 kV LT Puebla II; 1 at 400 kV LT Cruz Azul Maniobras; 1 at 400 kV LT Poza Rica II.
  • SE Jardin Bco. 1 (Sf6) 4at-1f-75MVA, 230/115 kV 0/6; 2 at 115 kV LT Veracruz II; 2 at 115 kV LT Las Brisas; 1 at 115 kV LT J.B. Lobos; 1 at 115 kV LT Infonavit.
  • SE San Cristobal Oriente MVAr Capacitor Bank of 15 MVAr in the voltage level of 115 kV.
  • SE Ocosingo MVAr Capacitor Bank of 7.5 MVAr in the voltage level of 115 kV.
Skills