PROJECT 248 SLT 1401 SE’S Y LT’S DE LAS AREAS BAJA CALIFORNIA Y NOROESTE (2A. FASE). CONTRACT No. PIF-008/2011

Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 LT’s with voltages of 230, 115 kV and a length of 99.2 km-c and 2 SE’s with voltages of 230, 115 kV with a capacity of 300 MVA and 22.5 MVAr of compensation and 9 feeders in high voltage, in the state of Sonora.

  • LT El Mayo – Huatabampo. 115 kV, 2 circuits, 27 km-l, 54 km-c, shares structures of 4c in 4 km with LT El Mayo Entq. – Navojoa Ind.
  • LT El Mayo Entronque Navojoa – Navojoa Industrial. 115 kV, 2 circuits, 17.4 km-l, 44.2 km-c.
  • LT El Mayo Entq. Pueblo Nuevo – Los Mochis II. 230 kV, 1 km-l, 1 km-c.
  • SE Huatabampo. 2 at 115 kV (LT El Mayo); 1 at 115 kV Tap. LT Huatabampo-Valle del Mayo- Navojoa.
  • SE El Mayo Bco. 1 + MVAr 4-At-1f-300 MVA 230/115/13.8 Kv 2/4; 2 AT 230 kV entq. LT Pueblo Nuevo-Los Mochis II; 2 at 115 kV LT Huatabampo: 2 at 115 kV entq. LT Navojoa-Navojoa Ind. And capacitor bank 22.5 MVAr.
Skills

Posted on

April 15, 2021

Submit a Comment

Your email address will not be published. Required fields are marked *

×