PROJECT <<267 SLT 1604 TRANMISION AYOTLA – CHALCO>>. CONTRACT PIF-015/2013

Construction and installation of 3 (three) works: 1 (one) transmission line of 230 kV, with a total length of 9.9 km-c and 2 (two) substations with voltages of 230 and 85 kV, with a capacity of 133.3 MVA and 2 (two) feeders with voltage of 230 kV, located in the state of State of Mexico. Includes activities of engineering, supply, construction and tests.

  • LT Ayotla – Chalco. 230 kV, 1c, Cs, 9.9 km-l, 9.9 km-c, power cable XLPE type, with copper conductor and transversal section of 1200 mm2 per phase.
  • Chalco Bco. 5. 4t-1f-33.33 MVA, 230/85 kV 1/0, 1 at 230 kV LT Ayotal, 3t-1f-33.33 MVA, 230/85 kV on behalf of CFE.
  • SE Ayotla. 1 at 230 kV LT Chalco.