Loss Reduction

BUSINESS LINES

WE HELP PROVIDE  A BETTER SERVICE

WE AID IN LOSS REDUCTION AND
IMPROVE ENERGY EFFICIENCY

We execute Engineering, Procurement and Construction (EPC), including testing and Commissioning, of Air and Ground distribution lines, at voltages of 13.8 kV, 23 kV and 34.5 kV, including distribution transformers, cabinet-type meters and socket type managed remotely by means of radio frequency communication system, which allows the reduction of energy losses (technical and non-technical) and reduction of operating costs (the process of reading, cutting and reconnection of the Meters is done remotely).

We have the

Experience

Installed meters

Transformation MVA

POWER GRIDS KM-C

×