PROJECT 211 SLT 1203 TRANSMISION Y TRANSFORMACION ORIENTAL-SURESTE (1A FASE). CONTRACT No. PIF-017/2009
Engineering, supply, construction, training and commissioning of 9 LT’s of 400, 230 and 115 kV and a total length of 196.1 km-c and 6 SE’s with voltages of 400, 230 and 115 kV, with a capacity of 1175 MVA nad 22.5 MVAr and 25 feeders, in the states of Chiapas and Veracruz.
- LT Jardin – Veracruz II. 115 kV, 2 circuits, self-supported towers, 1.1 km-l, 2.2 km-c, one conductor ACSR/As 795 per phase.
- LT Jardin – Infonavit 115 kV, 2 circuits, subterranean cables, 0.2 km-l, 1.3 km-c; conductor cable of the XLPE type copper and a transversal section of 1.000 squared millimeters per phase.
- LT Laguna Verde – Jamapa. 400 kV, 2 circuits, self-supported towers, 84.7 km-l, 168.4 km-c, two conductors ACSR/As 1113 per phase.
- LT Jamapa Entq. Veracruz II – Temascal II L1. 230 kV, 2 circuits, self-supported towers, 2.5 km-l, 5 km-c, ACSR/As 1113, one conductor per phase.
- LT Jamapa Entq. Jardin – Temascal II L2. 230 kV, 2 circuits, self-supported towers, 2.5 km-l, 500 km-c, ACSR/As 1113, one conductor per phase.
- LT Jardin – Las Brisas. 115 kV, 2 circuits, self-supported towers/subterranean cable, 3.1 km-l, 4.8 km-c. Conductor cable XLPE type, copper and a transversal section of 1.000 squared millimeters per phase.
- LT Jardin – J.B. Lobos. 115 kV, 2 circuits, self-supported towers/subterranean cables, 3.1 km-l, 4.8 km-c. Conductor cable XLPE type, copper and transversal section of 1.000 squared millimeters per phase and ACSR/As 795.
- LT Paso del Toro Entq. Boca del Rio – La Granja III. 115 kV, 4 circuits, self-supported towers, 0.3 km-l, 1.2 km-c, conductor cable ACSR/As 795.
- LT Jamapa Entq. Veracruz II – Amatlan II. 230 kV, 4 circuits, self-supported towers, 1.4 km-l, 5.6 km-c; conductor cable ACSR/As 1113, one conductor per phase.
- SE Jamapa Bcos. 1 y 2 7at-1f-125 MVA, 400/230 kV 2/8; 2 at 400 kV LT Laguna Verde (C1 + C2); 1 at 230 kV LT Jardin; 1 at 230 kV LT Veracruz II; 2 at 230 kV LT Temascal II; 2 at 230 kV LT Amatlan II; 2 at 230 kV LT Tamsa II.
- SE Paso del Toro 1 at 115 kV LT Granja III; 1 at 115 kV LT Boca del Rio.
- SE Laguna Verde (Sf6) Maniobras 2 at 400 kV LT Jamapa (C1+C2); 2 at 400 kV LT Laguna Verde (U1+U2); 1 at 400 kV LT Puebla II; 1 at 400 kV LT Cruz Azul Maniobras; 1 at 400 kV LT Poza Rica II.
- SE Jardin Bco. 1 (Sf6) 4at-1f-75MVA, 230/115 kV 0/6; 2 at 115 kV LT Veracruz II; 2 at 115 kV LT Las Brisas; 1 at 115 kV LT J.B. Lobos; 1 at 115 kV LT Infonavit.
- SE San Cristobal Oriente MVAr Capacitor Bank of 15 MVAr in the voltage level of 115 kV.
- SE Ocosingo MVAr Capacitor Bank of 7.5 MVAr in the voltage level of 115 kV.
Ubicación: México, Chiapas, Veracruz
Fecha de inicio: June 5, 2009
Fecha de terminación: March 8, 2011
PROJECT <<68 LT RED DE TRANSMISION ASOCIADA A EL PACIFICO>> CONTRACT No. PIF-010/2008
Engineering, procurement, supply, construction, training and commissioning of 2 LT’s of 400 kV and a total length of 282,3 km-c and 3 SE’s with voltages of 230 kV, with a capacity of 21 MVAr and 9 feeders, 4 new ones and 5 equivalent ones due to the increase of interruptive capacity, located in the state of Guerrero.
- LT Ixtapa Pot. – Pie de la Cuesta Pot. 400 kV. Initial operation at 230 kV, 2c, existing self-supported towers, 207.7 km-c; conductor cable: ACSR/As 1113, two conductors per phase. Laying of the second circuit. Includes the substitution of 207.7 km of Cgfo and the removal of 3 structures.
- LT Lazaro Cardenas Pot. – Ixtapa Pot. 400 kV. Initial operation at 230 kV, 2c, self-supported towers, 74.6 km-l, 74.6 km-c; conductor cable: ACSR 1113, two conductors per phase; guard wire: Opgw of 36 fibers + Aas 7 No. 8 AWG.
- SE Lazaro Cardenas Pot. 15 circuit breakers of 50 kA of interruptive capacity. Includes bus recalibration of 230 kV with the actual configuration.
- SE Pie de la Cuesta Pot. 1 at 230 kV (3 X 7 MVAr) LT Ixtapa Pot.
- SE Ixtapa Pot. 1 at 230 kV LT Lazaro Cardenas, 1 at 230 kV LT Pie de la Cuesta (C2).
Ubicación: México, Guerrero, Michoacán
Fecha de inicio: May 12, 2008
Fecha de terminación:
PROJECT <<170 LT RED DE TRANMISIÓN ASOCIDA A LA CH LA YESCA>>. CONTRACT No. PIF-014/2010
Engineering, procurement, supply, construction, training and commissioning of 2 LT’s of 400 kV and a total length of 220,1 km-c and 2 SE’s with voltages of 400 kV and 116.9 MVA of compensation of inductive type and 4 feeders, located in the state of Jalisco.
- LT ixtlahuacan entq. Tesistan – Aguascalientes pot. 400 kV, 2c, ta, 1.7 km-l, 1.7 km-c, ACSR/as 1113, two conductors per phase, with installation of 2.4 km of Opgw.
- LT La Yesca – Ixtlahuacant. 400 kV, 2 circuits, self-supported towers, 109.3 km-l, 218.6 km-c; conductor cable: ACSR/As 1113, two conductors per phase; guard wire: Opgw 36 fibers + 1 aas 7 No. 8 AWG.
- SE Ixtlahuacan. 2 at 400 kV LT La Yesca, 1 at 400 kV LT Tesistan and 1 at 400 kV LT Aguascalientes.
- SE La Yesca MVAr 7 X 16.7 MVAr, one-phase reactors in LT La Yesca-Ixtlahuacan (C1 + C2).
Ubicación: México, Jalisco
Fecha de inicio: July 5, 2010
Fecha de terminación: November 27, 2011
PROJECT 248 SLT 1401 SE’S Y LT’S DE LAS AREAS BAJA CALIFORNIA Y NOROESTE (2A. FASE). CONTRACT No. PIF-008/2011
Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 LT’s with voltages of 230, 115 kV and a length of 99.2 km-c and 2 SE’s with voltages of 230, 115 kV with a capacity of 300 MVA and 22.5 MVAr of compensation and 9 feeders in high voltage, in the state of Sonora.
- LT El Mayo – Huatabampo. 115 kV, 2 circuits, 27 km-l, 54 km-c, shares structures of 4c in 4 km with LT El Mayo Entq. – Navojoa Ind.
- LT El Mayo Entronque Navojoa – Navojoa Industrial. 115 kV, 2 circuits, 17.4 km-l, 44.2 km-c.
- LT El Mayo Entq. Pueblo Nuevo – Los Mochis II. 230 kV, 1 km-l, 1 km-c.
- SE Huatabampo. 2 at 115 kV (LT El Mayo); 1 at 115 kV Tap. LT Huatabampo-Valle del Mayo- Navojoa.
- SE El Mayo Bco. 1 + MVAr 4-At-1f-300 MVA 230/115/13.8 Kv 2/4; 2 AT 230 kV entq. LT Pueblo Nuevo-Los Mochis II; 2 at 115 kV LT Huatabampo: 2 at 115 kV entq. LT Navojoa-Navojoa Ind. And capacitor bank 22.5 MVAr.
Ubicación: México, Sonora
Fecha de inicio: August 9, 2011
Fecha de terminación: October 1, 2012
PROJECT 1601: 262 SLT 1601 TRANSMISION Y TRANSFORMACION NOROESTE – NORTE (1A. FASE). CONTRACT No. PIF-005/2012
Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 (three) transmission lines with voltages of 230 and 115 kV and a total length of 29.2 km-c and 2 (two) substations with voltages of 230 and 115 kV, with 133.3 MVA, 18 MVAr and 5 (five) feeders, located in the state of Chihuahua.
- LT Lopez Mateos – San Pedro Potencia. 230 kV, 1 circuit, self-supported towers, 21.3 km-l, 21.3 km-c, ACSR/As 1113, one conductor per phase.
- LT San Pedro Potencia Entq. Cm San Pedro – Basaseachic. 115 kV, 2 circuits, self-supported towers, 3.7 km-l, 7.4 km-c, ACSR/As 477, one conductor per phase.
- LT San Pedro Potencia Entq Cm Sand Pedro – Creel. 115 kV, 1 circuit, self-supported towers, 0.5 km-l, 0.5 km-c, ACSR/As 477, one conductor per phase.
- SE San Pedro Potencia Bco. 1. 1t-3f-100 MVA 230/115 kV 1/3; 1 at 230 kV LT Cuauhtemoc II; 1 at 115 kV LT CM San Pedro; 1 at 115 kV LT Basaseachi; 1 at 115 kV LT Creel; 1 reactor 18 MVAr in 13.8 kV to be installed in the tertiary of the transformation bank.
- SE Cuauhtemoc II Ampl. 1 at 115 kV LT San Pedro Potencia.
Ubicación: México, Chihuahua
Fecha de inicio: February 3, 2012
Fecha de terminación: January 17, 2013
PROJECT <<244 SE 1321 DISTRIBUCION NORESTE (3A. FASE)>> CONTRACT No. PIF-018/2011
Engineering, procurement of materials and permanent installed equipment, training, construction and commissioning of 2 works: one distribution substation with voltages of 115 kV and 13.8 kV, with a total capacity of 30 MVA; 1.8 MVAr in medium voltage; 2 feeders in high voltage and 4 feeders in medium voltage; 1 work of high voltage line in 115 kV with 2.476 km-c, located in the state of Chihuahua.
- LT Abraham Gonzalez Entq. Boquilla – Camargo Uno. 115 kV, 2 circuits, 1.24 km-l, conductor cable: 477 ACSR; self-supported poles.
- SE Abraham Gonzalez Bc.01 + MVAr. 1t-3f-30MVA-115/13.8 kV-2/4a+ 1,8MVAr.
Fecha de Inicio: 15-dic-11
Fecha de Terminación: 17-ene-13
Ubicación: México, Chihuahua
Fecha de inicio: December 15, 2011
Fecha de terminación: January 17, 2013
PROJECT “188 SE 1116 TRANSFORMACION DEL NORESTE” (3A. FASE). CONTRACT No. PIF-014/2011
Engineering, procurement of materials and permanent installed equipment, training, construction and commissioning of 6 (six) transmission lines with voltages of 400 and 138 kV and a total length of 85.65 km-c; and 6 (six) substations with voltages of 400 and 138 kV, with a total capacity of 500 MVA of transformation and 14 (fourteen) feeders, located in the state of Tamaulilpas.
- LT Guerreño Entq. Anahuac Cc – Aeropueto. 400 kV, 1c, Ta, 1.2 km-l, 2.4 km-c, ACSR/As 1113, two conductors per phase.
- LT Jarachina Entq Juarez – Delnosa II. 138 kV, 2c, Cs, 0.2 km-l, 0.4 km-c, 800, one conductor per phase. Subterranean cable, ampacity equivalent to 795 ACSR.
- LT Guerreño – Parque Industrial. 138 kV, 1c, Ta/Pa/Cs, 9.2 km-l, 9.2 km-c, ACSR/As 795, one conductor per phase. Laying of first circuit. Includes 2.8 km subterranean cable, ampacity equivalent to 795 ACSR.
- LT Guerreño – Juarez. 138 kV, 2c, Ta/Pa/Cs, 18.2 km-l, 36.1 km-c, ACSR/As 795, one conductor per phase.
- LT Anzalduas – Petrolera. 138 kV, 1c, Pa/Cs, 4.8 km-l, 4.8 km-c, ACSR/As 795, one conductor per phase. Includes 3.1 km of subterranean cable with ampacity equivalent to 795 ACSR.
- LT Guerreño – Petrolera. 138 kV, 2c, Ta/Pa, 32.7 km-l, 32.7 km-c, ACSR/As 795, one conductor per phase.
- SE Guerreño Bco. 1. 4t-1f-500 MVA 400/138 kV 2/5; 1 at 400 kV LT Anahuac Cc; 1 at 400 kV LT Aeropuerto; 1 at 138 kV LT Parque Industrial; 2 at 138 kV LT Petrolera; 2 at 138 kV LT Juarez.
- SE Jarachina Ampl. 1 at 138 kV LT Juarez; 1 at 138 kV LT Delnosa II.
- SE Juarez Ampl. 2 at 138 kV LT Guerreño C1 y C2.
- SE Petrolera Ampl. 1 at 138 kV LT Anzalduas.
- SE Parque Industrial Ampl. 1 at 138 kV LT Guerreño.
- SE Anzalduas Ampl. 1 at 138 kV LT Petrolera
Ubicación: México, Tamaulipas
Fecha de inicio: October 28, 2011
Fecha de terminación: May 4, 2013
S.E. CHAVEZ UNO, 115 KV, 1 FEEDER. CONTRACT RRNE-101010
Activities of engineering, supply, construction and tests.
Ubicación: México, Coahuila
Fecha de inicio: January 3, 2011
Fecha de terminación: August 30, 2011
PROJECT “209 SE 1212 SUR-PENINSULAR (7A. FASE)”. CONTRACT No. PIF-004/2012
Construction and installation of 1 (one) distribution substation with voltges of 115/13.8 kV, with a total capacity of 30 MVA of transformation, 1.8 MVAr of capacitive compensation and 8 (eight) feeders in high and medium voltage; and 1 (one) high voltage line in 115 kV with a total length of 2.3 km-c, located in the state Quintana Roo. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Quintana Roo
Fecha de inicio: February 10, 2012
Fecha de terminación: February 9, 2013
S.E. PTAR ATOTONILCO (CNA), 230 KV. CONTRACT No. RRCE-121002
Construction of civil and electromechanical work, engineering, supply and preoperational tests of 2 feeders in 230 kV, for the SE Ptar Atotonilco (CNA), located in the state of Hidalgo. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Hidalgo
Fecha de inicio: February 2, 2012
Fecha de terminación: October 2, 2012