PROJECT “274 SE 1620 DISTRIBUCION VALLE DE MEXICO (1A. FASE)”. CONTRACT PIF-022/2012
Engineering, procurement of materials and permanent installation equipment, training, construction and commissioning of 7 transmission lines with a voltage of 230 and 85 kV and a total length of 16.8 km-c and 10 substations with voltage of 230, 85 and 23 kV, with a capacity of 780 MVA and 46.8 MVAr of compensation and 123 feeders in high voltage, located in the state of Mexico City and State of Mexico.
- LT Coyoacan – Narvarte. 230 kV, 1 circuit, subterranean cable, 2.9 km-l, 2.9 km-c, gauge 1200 mm2, one conductor per phase.
- LT Veronica Entq. Cuauhtemoc – Morales. 230 kV, 2 circuits, subterranean cable, 1.6 km-l, 1.6 km-c, gauge 1200 mm2, one conductor per phase.
- Los Reyes Entq. La Paz – Aurora. 230 kV, 2 conductors, conic poles, 1.4 km-l, 2.8 km-c, ACSR/As 1113, one conductor per phase.
- LT Culhuacan – Xochimilco. 230 kV, 2 circuits, subterranean cable, 4.3 km-l, 8.6 km-c, gauge 1200mm2, one conductor per phase.
- LT El Rosal Entq. Odon de Buen – Topilejo. 230 kV, 2 circuits, conic poles, 0.3 km-l, 0.6 km-c, ACSR/As 1113, one conductor per phase.
- LT Chimalpa Entq. Remedios – Bosques. 230 kV, 2 circuits, conic poles, 0.1 km-l, 0.2 km-c, ACSR/As 1113, one conductor per phase.
- LT Tlatelulco Entq. San Francisco – Zicatepec. 85 kV, 2 circuits, conic poles/self-supported towers, 0.05 km-l, 0.1 km-c, ACSR/As 795, one conductor per phase.
- SE Narvarte Bcos. 1 y 2 Sf6 (Substitution), of the GIS type. 2t-3f-60 MVA 230/23 kV 2/16; 1 at 230 kV LT Coyoacan; 1 at 230 kV LT Condesa; capacitor bank 2 X 3.6 MVAr.
- SE Coyoacan, GIS type. 1 at 230 kV LT Narvarte.
- SE Veronica Bcos. 1 y 2 sf6 (Substitution). 2t-3f-30 MVA 85/23 kV 2/8; 2 at 85 kV LT Apasco C-1 and C-2; capacitor bank 2X1.8 MVAr.
- SE Los Reyes Bcos. 1 y 2 Sf6 (Substitution). GIS type. 2t-3f-60 MVA 230/23 kV 2/16; 1 at 230 kV LT La Paz; 1 at 230 kV LT Aurora; capacitor bank 2X3.6 MVAr.
- SE Culhuacan Bcos. 1 y 2 Sf6, GIS type. 2t-3f-60 MVA 230/23 kV 2/16; 2 at 230 kV LT Xochimilco C-1 and C-2; capacitor bank 2X3.6 MVAr.
- SE Xochimilco, GIS type. 2 at 230 kV LT Culhuacan C-1 and C-2.
- SE El Rosal Bcos. 1 y 2 Sf6, GIS type. 2t-3f-60 MVA 230/23 kV 2/16; 1 at 230 kV LT Contreras; 1 at 230 kV LT Topilejo; capacitor bank 2X3.6 MVAr.
- SE Chimalpa Bco. 1 Sf6, GIS type. 1t-3f-60 MVA 230/23 kV 2/8; 1 at 230 kV LT Remedios; 1 at 230 kV LT Bosques; capacitor bank of 3.6 MVAr.
- SE Tlatelulco Bcos. 1 y 2. 2t-3f-30 MVA 85/23 kV 2/8; 1 at 85 kV LT San Francisco; 1 at 85 kV LT Zictepec; capacitor bank 2X1.8 MVAr.
Ubicación: México, Ciudad de México, Estado de México
Fecha de inicio: November 9, 2012
Fecha de terminación: April 1, 2015
ELECTRICAL SUBSTATION SAN LUIS REY BANCO 1 + MVAR, CONTRACT RRN0-121001
Consists of: one three-phase transformation bank of 40 MVA in 230/13.8 kV, two feeders in 230 kV, five feeders in 13.8 kV and one capacitor bank in 13.8 kV of 2.4 MVAr, located in Sonora. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Sonora
Fecha de inicio: October 5, 2012
Fecha de terminación: July 20, 2014
LT SAN PEDRO POTENCIA – CAHUISORI. CONTRACT RRNE-131004
230 kV, 91.41 km 1c, 1113 ACSR/As, located in the state of Chihuahua. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Chihuahua
Fecha de inicio: June 20, 2013
Fecha de terminación: April 30, 2015
PROJECT <<267 SLT 1604 TRANMISION AYOTLA – CHALCO>>. CONTRACT PIF-015/2013
Construction and installation of 3 (three) works: 1 (one) transmission line of 230 kV, with a total length of 9.9 km-c and 2 (two) substations with voltages of 230 and 85 kV, with a capacity of 133.3 MVA and 2 (two) feeders with voltage of 230 kV, located in the state of State of Mexico. Includes activities of engineering, supply, construction and tests.
- LT Ayotla – Chalco. 230 kV, 1c, Cs, 9.9 km-l, 9.9 km-c, power cable XLPE type, with copper conductor and transversal section of 1200 mm2 per phase.
- Chalco Bco. 5. 4t-1f-33.33 MVA, 230/85 kV 1/0, 1 at 230 kV LT Ayotal, 3t-1f-33.33 MVA, 230/85 kV on behalf of CFE.
- SE Ayotla. 1 at 230 kV LT Chalco.
Ubicación: México, Estado de México
Fecha de inicio: November 20, 2013
Fecha de terminación: February 12, 2015
PROJECT <<243 SE 1322 DISTRIBUCION CENTRO (5TA. FASE)>> CONTRACT PIF-010/2014
- SE Estancita Bco. 1 (1t-3f-20 MVA-115/23 kV 2/5 A+ 1.2 MVAr-23 kV). Includes: 5.77 km of circuit of 23 kV.
- SE Ameca Bco. 1 (1t-3f-20 MVA-115/23 kV 2/5 A+ 1.2 MVAr-23 kV). Includes: 1.5 km of circuit of 23 kV.
- SE Guevara Ampl. (1 feeder-115 kV).
- SE Tecolotlan Bco. 1. 1t-3f-20 MVA-115/23 kV 2/4 A+ 1.2 MVAr-23kV. Includes 0.72 km of circuit of 23 kV.
- SE San Clemente Bco. 1. 1t-3f-20 MVA-115/23 kV 2/6 A+ 1.2 MVAr-23 kV. Includes 1.47 km of circuit of 23 kV.
- LT Cocula-Ameca (115 kV-1c-32.3 km-795 ACSR-TA/PT/800 mm2-Al-XLP).
- LT Ameca-Guevara (115 kV-1c-42.1 km-795 ACSR-TA/PT/800 mm2-Al-XLP).
- LT Cocula Entq. Acatlan-Tecolotaln (115 kV-2c-4.1 km-795 ACSR-TA/PT/800 mm –AL-XLP).
- LT San Clemente-Acatlan (115 kV-1c-59.58 km-477 ACSR- TA/PT/800 mm2-AL-XLP).
- LT San Clemente-Mezquitan (115 kV-1c-32.82 km-477 ACSR-TA/PT).
Ubicación: México, Estado de México
Fecha de inicio: May 22, 2014
Fecha de terminación: December 12, 2015
PROJECT <<308 SLT 1804 SUBESTACIONES Y LINEAS TRANSMSION ORIENTAL – PENINSULAR (3A. FASE) (2DA. CONVOCATORIA)>>. CONTRACT PIF-018/2014
The execution of all the works necessary for the construction and installation of 1 (one) substation with voltages of 115 and 13.8 kV with a total capacity of 40 MVA, 2 (two) feeders and 2 (two) transmission lines with voltage of 115 kV and a total length of 67.12 km-c, located in the state of Campeche. Includes works of engineering, supply, construction and tests.
- LT Puerto Real – Carmen (Provisional line). 115 kV, 2c, pm, 13.4 km-l, 26.8 km-c, ACSR/As 477, one conductor per phase.
- LT Puerto Real – Carmen. 115 kV, 2c, Ta/Cs, 19.36 km-l, 40.32 km-c, ACSR/As 1113, one conductor per phase.
- SE Carmen. 2 at 115 kV LT Sabancuy II (C1 + C2).
Ubicación: México, Campeche
Fecha de inicio: October 2, 2014
Fecha de terminación: April 15, 2016
PROJECT <<322 SLT 1921 REDUCCION DE PERDIDAS DE ENERGIA EN DISTRIBUCION (4A FASE)>>. CONTRACT PIF-007/2015
Execution of all the works necessary for the construction and installation of 10 (ten) works: 6 (six) works of loss reduction with voltage of 23 kV, a total capacity of 102.42 MVA of transformation and the construction of 427.54 km-c of line; and 4 (four) works of measurement assurance. Said works imply the removal, supply and installation of 250,522 energy meters AMI type with any type of communication; located in the state of Mexico City and State of Mexico. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Campeche
Fecha de inicio: January 30, 2015
Fecha de terminación: December 31, 2017
PROJECT “320 LT 1905 TRANSMISION SURESTE-PENINSULAR (2A FASE)”. CONTRACT PIF-023/2015
Construction and installation of 3 (three) substations with a total capacity of 48 MVAr of compensation, with 4 (four) feeders in 230 and 115 kV; 2 (two) transmission lines with voltage of 230 kV with a total length of 367.4 km-c, located in the state of Campeche and Quintana Roo.
Ubicación: México, Campeche, Quintana Roo
Fecha de inicio:
Fecha de terminación:
PROJECT “292 SE 1701 SUBSTATION CHIMALPA DOS”
Construction and installation of 2 (two) transmission lines with voltage of 230 and 400 KV and a total length of 19.4 km-c, located in the state of State of Mexico. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Estado de México
Fecha de inicio:
Fecha de terminación:
LT TAXQUEÑA – 93160-TOPILEJO Y EL OLIVAR – 93E30 – ODON DE BUEN”. CONTRACT RRCE-02
For the uplifting of a line section of 230 kV, 2 circuits, 1 conductor per phase, cable 1113 ACSR/As, self-supported steel towers/conic poles, 0.35 km-l, in the delegation Alvaro Borego, Mexico City. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Ciudad de México
Fecha de inicio:
Fecha de terminación: