LT AMERICAS – SABINAS HIDALGO. CONTRACT RRNE-THGN-C0-05-16
115 kV – 1c – 2 km – 795 kcm ACSR/As – 7#8 Ass – Pa, located in the state of Nuevo Leon. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Nuevo León
Fecha de inicio: June 20, 2016
Fecha de terminación: October 17, 2016
PROJECT 214 SE 1210 NORTE-NORESTE 6A. FASE. CONTRACT PIF-048/2015
Execution of all the works necessary for the construction and installation of 1 (one) work: 1 (one) transmission line with voltage of 115 kV with a total length of 24.5 km-c, located in the state of Sonora. Includes activities of engineering, supply, construction and tests..
Ubicación: México, Sonora
Fecha de inicio: December 22, 2015
Fecha de terminación: March 15, 2017
PROJECT 214 SE 1210 NORTE – NOROESTE (9A. FASE). CONTRACT PIF-005/2016
Construction and installation of 2 (two) substations with transformation ratio with voltages of 115/34.5 kV, with a capacity of 30 MVA and 1.8 MVAr of compensation and 4 (four) feeders, and 1 (one) transmission line with voltage of 115 kV and a total length of 38.9 km-c, located in the state of Chihuahua. Includes activities of engineering, supply, construction and tests.
Ubicación: México, Chihuahua
Fecha de inicio: April 15, 2016
Fecha de terminación: June 8, 2017
PROJECT 253 SE 1420 DISTRIBUCION NORTE (3A FASE). CONTRACT PIF-010/2016
Construction and installation of 1 (one) substation with transformation ratio of 115/13.8 kV, with a capacity of 30 MVA and 1.8 MVAr of compensation and 2 (two) feeders in high voltage, 6 (six) feeders in medium voltage and 1 (one) transmission line with voltage of 115 kV and a total length of 0.5 km-c, located in the state of Tamaulipas. Includes activites of engineering, supply, construction and tests.
Ubicación: México, Tamaulipas
Fecha de inicio: June 21, 2016
Fecha de terminación: September 13, 2017
LT ANGOSTURA-TAPACHULA. CONTRACT RRPE-AD-C0-001-16
Execution of the emergency works for the provisional and definitive rehabilitation of the collapsed structures of the transmission line Angostura-Tapachula, Ang-A3t30-Thp, 400 kV-2c-1113 ACSR/As-Ta, located in the state of Chiapas.
Ubicación: México, Chiapas
Fecha de inicio: May 30, 2016
Fecha de terminación: July 23, 2016
SE ESCARCEGA. CONTRACT RRPE-161001
Construction of the civil and electromechanical work with engineering and partial supply of a feeder in 115 kV in the SE Escarcega Potencia, located in the state of Campeche.
Ubicación: México, Campeche
Fecha de inicio: August 8, 2016
Fecha de terminación: March 22, 2017
PROJECT 339 SLT 2021 REDUCCION DE PERDIDAS DE ENERGIA EN DISTRIBUCION (5TA. FASE). CONTRACT PIF-020/2016
Construction and installation of 11 (eleven) works: 10 (ten) works of loss reduction with a total capacity of 162.315 MVA of transformation and the construction of 1,185 km-c of line with a voltage of 23 kV; and 1 (one) work of measurement assurance. Said works imply the supply and installation of 378,510 energy meters AMI type with any type of communication, located in the Mexico City and State of Mexico. Includes activities of engineering, supply, construction, preoperational tests and commissioning.
Ubicación: México, Ciudad de México, Estado de México
Fecha de inicio: September 7, 2016
Fecha de terminación: June 5, 2018
LT CONTADERO. CONTRACT RRCE-161005
Construction of civil and electromechanical work of the crossings with the LT Contadero – Aguilas of 230 kV – 2c – 0-72 km – 1113 ACSR/As – 1 c/f – Ta and LT Tacubaya – Reforma of 85 kV – 2c – 0-61 km – 795 ACSR/As – 1 c/f – Ta/Pa, includes supply and dismounting. Works located in Mexico City.
Ubicación: México, Estado de México
Fecha de inicio: January 14, 2017
Fecha de terminación: August 15, 2017
LT CUAJIMALPA. CONTRACT RRCE-C0-07-16
Construction of civil and electromechanical work of the crossing with the LT Cuajimalpa – Aguilas of 230 kV – 2c – 0-5 km – 1113 ACSR/As – 1 c/f – Ta/Pa, includes supply and dismounting. Work located in the delegation of Cuajimalpa, Mexico City.
Ubicación: México, Estado de México
Fecha de inicio: January 16, 2017
Fecha de terminación: June 15, 2017
ENLARGEMENT OF TH SE CALERA II
Execution of the engineering, supply, construction and preoperational tests of the enlargement of a substation of 230 kV, located in the state of Zacatecas, including: supply of a three-phase autotransformer of 75/100 MVA with nominal voltages of 230/115/13.8 kV, transfer bay, relocation of reactor R1 and Auxiliary Services 13.8 kV of the tertiary, recalibration of buses in zone 115 kV and 230 kV.
Ubicación: México, Zacatecas
Fecha de inicio: January 23, 2017
Fecha de terminación: August 20, 2018