PROJECT “320 LT 1905 TRANSMISION SURESTE-PENINSULAR (2A FASE)”. CONTRACT PIF-023/2015

Construction and installation of 3 (three) substations with a total capacity of 48 MVAr of compensation, with 4 (four) feeders in 230 and 115 kV; 2 (two) transmission lines with voltage of 230 kV with a total length of 367.4 km-c, located in the state of Campeche and Quintana Roo.