  • LT Moctezuma – Nuevo Casas Grandes II (0-51 km-l, 164.8 km-c. Section 1 from SE Moctezuma Al km 0+510. 230 kV, 1c, self-supported towers, 0-51 km-l, 0.51 km-c, ACSR/As 1113 one conductor per phase; section 2 from km 0+510 to the SE Nuevo Casas Grandes II, 400 kV, initial operation 230 kV, 2c, existing self-supported towers, 0.00 km-l 164.29 km-c, ACSR/As 1113 two conductors per phase. Laying of the second circuit.
  • SE Nacozari Mvar L1+L2 (neutral reactor for LT Nuevo Casas Grandes II (C1) and LT Nuevo Casas Grandes II (C2)).
  • SE Moctezuma (1 at 230 kV LT Nuevo Casas Grandes II (C2)).
  • SE Nuevo Casas Grandes II ampl. + Mvar (1 at 230 kV LT Moctezuma (C2) and one-phase reactors, 3 X 7 Mvar).