PROJECT <<244 SE 1321 DISTRIBUCION NORESTE (3A. FASE)>> CONTRACT No. PIF-018/2011

Engineering, procurement of materials and permanent installed equipment, training, construction and commissioning of 2 works: one distribution substation with voltages of 115 kV and 13.8 kV, with a total capacity of 30 MVA; 1.8 MVAr in medium voltage; 2 feeders in high voltage and 4 feeders in medium voltage; 1 work of high voltage line in 115 kV with 2.476 km-c, located in the state of Chihuahua.

  • LT Abraham Gonzalez Entq. Boquilla – Camargo Uno. 115 kV, 2 circuits, 1.24 km-l, conductor cable: 477 ACSR; self-supported poles.
  • SE Abraham Gonzalez Bc.01 + MVAr. 1t-3f-30MVA-115/13.8 kV-2/4a+ 1,8MVAr.

Fecha de Inicio: 15-dic-11
Fecha de Terminación: 17-ene-13