PROJECT <<308 SLT 1804 SUBESTACIONES Y LINEAS TRANSMSION ORIENTAL – PENINSULAR (3A. FASE) (2DA. CONVOCATORIA)>>. CONTRACT PIF-018/2014

The execution of all the works necessary for the construction and installation of 1 (one) substation with voltages of 115 and 13.8 kV with a total capacity of 40 MVA, 2 (two) feeders and 2 (two) transmission lines with voltage of 115 kV and a total length of 67.12 km-c, located in the state of Campeche. Includes works of engineering, supply, construction and tests.

  • LT Puerto Real – Carmen (Provisional line). 115 kV, 2c, pm, 13.4 km-l, 26.8 km-c, ACSR/As 477, one conductor per phase.
  • LT Puerto Real – Carmen. 115 kV, 2c, Ta/Cs, 19.36 km-l, 40.32 km-c, ACSR/As 1113, one conductor per phase.
  • SE Carmen. 2 at 115 kV LT Sabancuy II (C1 + C2).