PROJECT LT 303 IXTAPA – PIE DE LA CUESTA CONTRACT PIF-010/99

Engineering, supply, construction, training and commissioning of the following works, located in the state of Guerrero:

  • LT Ixtapa – Pie de la Cuesta. 400 kV, 207 km-l; conductor cable: ACSR/AS 1113, 2 wires/phase; guard wire: 2 Aas 7 No. 8 AWG.
  • LT Pie de la Cuesta Entq. Mezcala – El Quemado. 230 kV, 22 km-l, 66 km-c; conductor cable: ACSR/AS 1113, 1 wire/phase; guard wire: 1 Aas 7 No. 8 AWG + 1 Opgw 36 fibers.
  • LT El Quemado Entq Mezcala – Los Amates. 230 kV, 5.00 km-l, 10.00 km-c; conductor cable: ACSR/AS 1113, 1 wire/phase; guard wire: 1 Aas 7 No. 8 AWG + 1 Opgw 36 fibers.