PROJECT 50 LT 610 TRANSMISION NOROESTE – NORTE (2A FASE). CONTRACT No. PIF-026/2006
- LT Moctezuma – Nuevo Casas Grandes II (0-51 km-l, 164.8 km-c. Section 1 from SE Moctezuma Al km 0+510. 230 kV, 1c, self-supported towers, 0-51 km-l, 0.51 km-c, ACSR/As 1113 one conductor per phase; section 2 from km 0+510 to the SE Nuevo Casas Grandes II, 400 kV, initial operation 230 kV, 2c, existing self-supported towers, 0.00 km-l 164.29 km-c, ACSR/As 1113 two conductors per phase. Laying of the second circuit.
- SE Nacozari Mvar L1+L2 (neutral reactor for LT Nuevo Casas Grandes II (C1) and LT Nuevo Casas Grandes II (C2)).
- SE Moctezuma (1 at 230 kV LT Nuevo Casas Grandes II (C2)).
- SE Nuevo Casas Grandes II ampl. + Mvar (1 at 230 kV LT Moctezuma (C2) and one-phase reactors, 3 X 7 Mvar).
Ubicación: México, Sinaloa, Sonora
Fecha de inicio: December 8, 2006
Fecha de terminación: August 31, 2008
PROJECT 218 LT TRANSMISSION GRID ASSOCIATED TO THE PROJECT OF OPEN SEASON AND OAXACA II, III, IV (1A. FASE)
Engineering, procurement of materials and equipments of permanent installation, training, construction and commissioning of 2 transmission lines with voltage of 400 kV and a length of 424.2 km-c (LT Juile – Cerro de Oro 400 kV-154.28 km-c and LT La Ventosa – Juile 400 kV 270-6 km-c), and 3 substations with voltages of 400, 230 and 115 kV with a capacity of 2,125 MVA, 75 MVAr and 8 feeders (SE Cerro de Oro 400 kV, SE Juile + MVAr 400 kV and SE La Ventosa Bcos. 1, 2 and 3 400/230/115 kV). The titular of the Contract with CFE was constituted by ISOLUX, ELECTRICAS / EDEMTEC, PIDIRELYS (Electricas de Medellin/Edemtec has a participation of 21.02% on the project).
Ubicación: México, Oaxaca, Veracruz
Fecha de inicio: September 10, 2008
Fecha de terminación: October 4, 2010
PROJECT 211 SLT 1203 TRANSMISION Y TRANSFORMACION ORIENTAL-SURESTE (1A FASE). CONTRACT No. PIF-017/2009
Engineering, supply, construction, training and commissioning of 9 LT’s of 400, 230 and 115 kV and a total length of 196.1 km-c and 6 SE’s with voltages of 400, 230 and 115 kV, with a capacity of 1175 MVA nad 22.5 MVAr and 25 feeders, in the states of Chiapas and Veracruz.
- LT Jardin – Veracruz II. 115 kV, 2 circuits, self-supported towers, 1.1 km-l, 2.2 km-c, one conductor ACSR/As 795 per phase.
- LT Jardin – Infonavit 115 kV, 2 circuits, subterranean cables, 0.2 km-l, 1.3 km-c; conductor cable of the XLPE type copper and a transversal section of 1.000 squared millimeters per phase.
- LT Laguna Verde – Jamapa. 400 kV, 2 circuits, self-supported towers, 84.7 km-l, 168.4 km-c, two conductors ACSR/As 1113 per phase.
- LT Jamapa Entq. Veracruz II – Temascal II L1. 230 kV, 2 circuits, self-supported towers, 2.5 km-l, 5 km-c, ACSR/As 1113, one conductor per phase.
- LT Jamapa Entq. Jardin – Temascal II L2. 230 kV, 2 circuits, self-supported towers, 2.5 km-l, 500 km-c, ACSR/As 1113, one conductor per phase.
- LT Jardin – Las Brisas. 115 kV, 2 circuits, self-supported towers/subterranean cable, 3.1 km-l, 4.8 km-c. Conductor cable XLPE type, copper and a transversal section of 1.000 squared millimeters per phase.
- LT Jardin – J.B. Lobos. 115 kV, 2 circuits, self-supported towers/subterranean cables, 3.1 km-l, 4.8 km-c. Conductor cable XLPE type, copper and transversal section of 1.000 squared millimeters per phase and ACSR/As 795.
- LT Paso del Toro Entq. Boca del Rio – La Granja III. 115 kV, 4 circuits, self-supported towers, 0.3 km-l, 1.2 km-c, conductor cable ACSR/As 795.
- LT Jamapa Entq. Veracruz II – Amatlan II. 230 kV, 4 circuits, self-supported towers, 1.4 km-l, 5.6 km-c; conductor cable ACSR/As 1113, one conductor per phase.
- SE Jamapa Bcos. 1 y 2 7at-1f-125 MVA, 400/230 kV 2/8; 2 at 400 kV LT Laguna Verde (C1 + C2); 1 at 230 kV LT Jardin; 1 at 230 kV LT Veracruz II; 2 at 230 kV LT Temascal II; 2 at 230 kV LT Amatlan II; 2 at 230 kV LT Tamsa II.
- SE Paso del Toro 1 at 115 kV LT Granja III; 1 at 115 kV LT Boca del Rio.
- SE Laguna Verde (Sf6) Maniobras 2 at 400 kV LT Jamapa (C1+C2); 2 at 400 kV LT Laguna Verde (U1+U2); 1 at 400 kV LT Puebla II; 1 at 400 kV LT Cruz Azul Maniobras; 1 at 400 kV LT Poza Rica II.
- SE Jardin Bco. 1 (Sf6) 4at-1f-75MVA, 230/115 kV 0/6; 2 at 115 kV LT Veracruz II; 2 at 115 kV LT Las Brisas; 1 at 115 kV LT J.B. Lobos; 1 at 115 kV LT Infonavit.
- SE San Cristobal Oriente MVAr Capacitor Bank of 15 MVAr in the voltage level of 115 kV.
- SE Ocosingo MVAr Capacitor Bank of 7.5 MVAr in the voltage level of 115 kV.
Ubicación: México, Chiapas, Veracruz
Fecha de inicio: June 5, 2009
Fecha de terminación: March 8, 2011
PROJECT <<68 LT RED DE TRANSMISION ASOCIADA A EL PACIFICO>> CONTRACT No. PIF-010/2008
Engineering, procurement, supply, construction, training and commissioning of 2 LT’s of 400 kV and a total length of 282,3 km-c and 3 SE’s with voltages of 230 kV, with a capacity of 21 MVAr and 9 feeders, 4 new ones and 5 equivalent ones due to the increase of interruptive capacity, located in the state of Guerrero.
- LT Ixtapa Pot. – Pie de la Cuesta Pot. 400 kV. Initial operation at 230 kV, 2c, existing self-supported towers, 207.7 km-c; conductor cable: ACSR/As 1113, two conductors per phase. Laying of the second circuit. Includes the substitution of 207.7 km of Cgfo and the removal of 3 structures.
- LT Lazaro Cardenas Pot. – Ixtapa Pot. 400 kV. Initial operation at 230 kV, 2c, self-supported towers, 74.6 km-l, 74.6 km-c; conductor cable: ACSR 1113, two conductors per phase; guard wire: Opgw of 36 fibers + Aas 7 No. 8 AWG.
- SE Lazaro Cardenas Pot. 15 circuit breakers of 50 kA of interruptive capacity. Includes bus recalibration of 230 kV with the actual configuration.
- SE Pie de la Cuesta Pot. 1 at 230 kV (3 X 7 MVAr) LT Ixtapa Pot.
- SE Ixtapa Pot. 1 at 230 kV LT Lazaro Cardenas, 1 at 230 kV LT Pie de la Cuesta (C2).
Ubicación: México, Guerrero, Michoacán
Fecha de inicio: May 12, 2008
Fecha de terminación:
PROJECT <<170 LT RED DE TRANMISIÓN ASOCIDA A LA CH LA YESCA>>. CONTRACT No. PIF-014/2010
Engineering, procurement, supply, construction, training and commissioning of 2 LT’s of 400 kV and a total length of 220,1 km-c and 2 SE’s with voltages of 400 kV and 116.9 MVA of compensation of inductive type and 4 feeders, located in the state of Jalisco.
- LT ixtlahuacan entq. Tesistan – Aguascalientes pot. 400 kV, 2c, ta, 1.7 km-l, 1.7 km-c, ACSR/as 1113, two conductors per phase, with installation of 2.4 km of Opgw.
- LT La Yesca – Ixtlahuacant. 400 kV, 2 circuits, self-supported towers, 109.3 km-l, 218.6 km-c; conductor cable: ACSR/As 1113, two conductors per phase; guard wire: Opgw 36 fibers + 1 aas 7 No. 8 AWG.
- SE Ixtlahuacan. 2 at 400 kV LT La Yesca, 1 at 400 kV LT Tesistan and 1 at 400 kV LT Aguascalientes.
- SE La Yesca MVAr 7 X 16.7 MVAr, one-phase reactors in LT La Yesca-Ixtlahuacan (C1 + C2).
Ubicación: México, Jalisco
Fecha de inicio: July 5, 2010
Fecha de terminación: November 27, 2011
PROJECT 248 SLT 1401 SE’S Y LT’S DE LAS AREAS BAJA CALIFORNIA Y NOROESTE (2A. FASE). CONTRACT No. PIF-008/2011
Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 LT’s with voltages of 230, 115 kV and a length of 99.2 km-c and 2 SE’s with voltages of 230, 115 kV with a capacity of 300 MVA and 22.5 MVAr of compensation and 9 feeders in high voltage, in the state of Sonora.
- LT El Mayo – Huatabampo. 115 kV, 2 circuits, 27 km-l, 54 km-c, shares structures of 4c in 4 km with LT El Mayo Entq. – Navojoa Ind.
- LT El Mayo Entronque Navojoa – Navojoa Industrial. 115 kV, 2 circuits, 17.4 km-l, 44.2 km-c.
- LT El Mayo Entq. Pueblo Nuevo – Los Mochis II. 230 kV, 1 km-l, 1 km-c.
- SE Huatabampo. 2 at 115 kV (LT El Mayo); 1 at 115 kV Tap. LT Huatabampo-Valle del Mayo- Navojoa.
- SE El Mayo Bco. 1 + MVAr 4-At-1f-300 MVA 230/115/13.8 Kv 2/4; 2 AT 230 kV entq. LT Pueblo Nuevo-Los Mochis II; 2 at 115 kV LT Huatabampo: 2 at 115 kV entq. LT Navojoa-Navojoa Ind. And capacitor bank 22.5 MVAr.
Ubicación: México, Sonora
Fecha de inicio: August 9, 2011
Fecha de terminación: October 1, 2012
PROJECT 1601: 262 SLT 1601 TRANSMISION Y TRANSFORMACION NOROESTE – NORTE (1A. FASE). CONTRACT No. PIF-005/2012
Engineering, procurement of materials and permanent installation equipments, training, construction and commissioning of 3 (three) transmission lines with voltages of 230 and 115 kV and a total length of 29.2 km-c and 2 (two) substations with voltages of 230 and 115 kV, with 133.3 MVA, 18 MVAr and 5 (five) feeders, located in the state of Chihuahua.
- LT Lopez Mateos – San Pedro Potencia. 230 kV, 1 circuit, self-supported towers, 21.3 km-l, 21.3 km-c, ACSR/As 1113, one conductor per phase.
- LT San Pedro Potencia Entq. Cm San Pedro – Basaseachic. 115 kV, 2 circuits, self-supported towers, 3.7 km-l, 7.4 km-c, ACSR/As 477, one conductor per phase.
- LT San Pedro Potencia Entq Cm Sand Pedro – Creel. 115 kV, 1 circuit, self-supported towers, 0.5 km-l, 0.5 km-c, ACSR/As 477, one conductor per phase.
- SE San Pedro Potencia Bco. 1. 1t-3f-100 MVA 230/115 kV 1/3; 1 at 230 kV LT Cuauhtemoc II; 1 at 115 kV LT CM San Pedro; 1 at 115 kV LT Basaseachi; 1 at 115 kV LT Creel; 1 reactor 18 MVAr in 13.8 kV to be installed in the tertiary of the transformation bank.
- SE Cuauhtemoc II Ampl. 1 at 115 kV LT San Pedro Potencia.
Ubicación: México, Chihuahua
Fecha de inicio: February 3, 2012
Fecha de terminación: January 17, 2013
PROJECT <<244 SE 1321 DISTRIBUCION NORESTE (3A. FASE)>> CONTRACT No. PIF-018/2011
Engineering, procurement of materials and permanent installed equipment, training, construction and commissioning of 2 works: one distribution substation with voltages of 115 kV and 13.8 kV, with a total capacity of 30 MVA; 1.8 MVAr in medium voltage; 2 feeders in high voltage and 4 feeders in medium voltage; 1 work of high voltage line in 115 kV with 2.476 km-c, located in the state of Chihuahua.
- LT Abraham Gonzalez Entq. Boquilla – Camargo Uno. 115 kV, 2 circuits, 1.24 km-l, conductor cable: 477 ACSR; self-supported poles.
- SE Abraham Gonzalez Bc.01 + MVAr. 1t-3f-30MVA-115/13.8 kV-2/4a+ 1,8MVAr.
Fecha de Inicio: 15-dic-11
Fecha de Terminación: 17-ene-13
Ubicación: México, Chihuahua
Fecha de inicio: December 15, 2011
Fecha de terminación: January 17, 2013
PROJECT “188 SE 1116 TRANSFORMACION DEL NORESTE” (3A. FASE). CONTRACT No. PIF-014/2011
Engineering, procurement of materials and permanent installed equipment, training, construction and commissioning of 6 (six) transmission lines with voltages of 400 and 138 kV and a total length of 85.65 km-c; and 6 (six) substations with voltages of 400 and 138 kV, with a total capacity of 500 MVA of transformation and 14 (fourteen) feeders, located in the state of Tamaulilpas.
- LT Guerreño Entq. Anahuac Cc – Aeropueto. 400 kV, 1c, Ta, 1.2 km-l, 2.4 km-c, ACSR/As 1113, two conductors per phase.
- LT Jarachina Entq Juarez – Delnosa II. 138 kV, 2c, Cs, 0.2 km-l, 0.4 km-c, 800, one conductor per phase. Subterranean cable, ampacity equivalent to 795 ACSR.
- LT Guerreño – Parque Industrial. 138 kV, 1c, Ta/Pa/Cs, 9.2 km-l, 9.2 km-c, ACSR/As 795, one conductor per phase. Laying of first circuit. Includes 2.8 km subterranean cable, ampacity equivalent to 795 ACSR.
- LT Guerreño – Juarez. 138 kV, 2c, Ta/Pa/Cs, 18.2 km-l, 36.1 km-c, ACSR/As 795, one conductor per phase.
- LT Anzalduas – Petrolera. 138 kV, 1c, Pa/Cs, 4.8 km-l, 4.8 km-c, ACSR/As 795, one conductor per phase. Includes 3.1 km of subterranean cable with ampacity equivalent to 795 ACSR.
- LT Guerreño – Petrolera. 138 kV, 2c, Ta/Pa, 32.7 km-l, 32.7 km-c, ACSR/As 795, one conductor per phase.
- SE Guerreño Bco. 1. 4t-1f-500 MVA 400/138 kV 2/5; 1 at 400 kV LT Anahuac Cc; 1 at 400 kV LT Aeropuerto; 1 at 138 kV LT Parque Industrial; 2 at 138 kV LT Petrolera; 2 at 138 kV LT Juarez.
- SE Jarachina Ampl. 1 at 138 kV LT Juarez; 1 at 138 kV LT Delnosa II.
- SE Juarez Ampl. 2 at 138 kV LT Guerreño C1 y C2.
- SE Petrolera Ampl. 1 at 138 kV LT Anzalduas.
- SE Parque Industrial Ampl. 1 at 138 kV LT Guerreño.
- SE Anzalduas Ampl. 1 at 138 kV LT Petrolera
Ubicación: México, Tamaulipas
Fecha de inicio: October 28, 2011
Fecha de terminación: May 4, 2013
S.E. CHAVEZ UNO, 115 KV, 1 FEEDER. CONTRACT RRNE-101010
Activities of engineering, supply, construction and tests.
Ubicación: México, Coahuila
Fecha de inicio: January 3, 2011
Fecha de terminación: August 30, 2011